Roadworks & civil works
Temporary boundaries.
For works that move.
Coordinate the work zone, pedestrian routes and access points. Bring every section of the boundary into one plan.
Choose by purpose
The right edge. For each part of the works.
Start with what the boundary needs to do. Explore the three systems, then keep the options you need in your project brief.

Open work-zone boundary
Keep the work zone in view.
An open welded grid within a steel frame. Choose the panel format around the boundary, then specify the connections and ground interface together.
- Construction
- Steel frame with welded mesh infill
- The range
- Panel formats and reinforcement options
- Plan with
- Run length, height, bases and support

Visually enclosed work zone
Define a visually enclosed edge.
Profiled steel sheets held within a frame form a solid boundary. Locate the enclosed sections and openings, and include the panel coverage in the support review.
- Construction
- Profiled steel sheet and frame
- The range
- Panel configurations and matching gates
- Plan with
- Visibility, exposure, support and openings

Pedestrian route definition
Give the planned route an edge.
Steel tube barriers with hook-and-eye connections and a choice of feet. Specify them around the pedestrian route and clear space provided in your site plan.
- Construction
- Steel tube frame and connecting hooks
- The range
- Panel formats and foot options
- Plan with
- Route width, turns and the foot footprint
Choose model dimensions and support with the relevant series. These systems define work zones and pedestrian routes; they are not vehicle-restraint barriers.
No systems selected yetPlan the work sections
One project. Different conditions along the line.
Record the known conditions for each section or phase. Keep changing ground, access and screening requirements together without losing their differences.
Enter the route and clear widths from your site plan. Model quantities and support arrangements are reviewed against the supplied layout and conditions.
In the working environment
Read the whole boundary.
The panel is only part of the picture. Look at the continuous line, the ground beneath it and the space on either side.

A continuous line.
Connected mesh panels define the edge of the work area while retaining views through the infill.
Every section meets the site.
Panel feet sit along the ground edge. Record surface changes and available base space in each section.
Consider both sides.
Earthworks and equipment sit beyond the fence. Mark the intended routes and access openings on your layout.
Your roadworks brief
Bring the sections together.
Request system and model options, a section-by-section equipment schedule, available drawings and quotation requirements.
Selected systems
Work sections
Edit the planRoadworks details carried over from your application plan.
Prepare here. Send from your email app.
Attach your site layout or BOQ when sending the enquiry.
